GWT provides a Timer class with a schedule() method, akin to the JavaScript language's own setTimeout() method. GWT提供一个Timer类,其中的schedule()方法与JavaScript语言自己的setTimeout()方法相似。
The important tenant of the backward schedule method of productivity is forgoing the to-do list altogether and instead scheduling everything into your day. 倒序高效计划法最重要的是完全放弃任务清单,直接把每一项任务排到日程里。
Proposes an efficient TIN-based node schedule method for field estimation in wireless sensor networks. 针对场监测应用的特点提出了一种基于不规则三角网(TIN)的无线传感器网络节点调度方法。
Design of Function Block Based on EPA Specification and Research on Schedule Method 基于EPA标准的功能块设计与调度方法研究
Research on Airplane Schedule Method Based on Time and Speed Optimization 基于时间和速度优化的飞机起飞调度方法研究
Review and approve construction schedule and method statement by the contractor. 审核和审批土建施工单位的施工计划、施工方案。
Excel's electronic schedule method in resolving pinch point in heat exchange network 求解换热网络夹点的Excel电子表格法
Study on the Project Schedule Optimization Method 工程项目进度计划优化方法的研究
The improvement of earned value analysis in schedule measurement method 挣得值分析在项目进度评测中的改进方法
The Research and Implement of Optimized Schedule Method for VLSI Tester 集成电路测试设备资源的优化配置方法研究与实现
In addition, a real time trading schedule method based on the "AGC/ MGC Dispatch Algorithm" used in the Real-Time market is presented. 针对实时市场的运营模式,提出了相适应的AGC/MGC一体化实时调度算法;
Channel gain schedule method on the aeroengine complex control scheme realization 实现复杂控制计划的控制通道增益匹配方法
Workout civil engineering construction schedule with method planning as a whole 浅谈用统筹法编制市政道路工程施工进度计划
Research on Cooling Schedule Selecting Method in Simulated Annealing Algorithm 模拟退火算法中冷却调度选取方法的研究
In this paper the author researched the flight schedule optimization method based on conflicts detecting from the point view of air traffic management. 本文站在空中交通流量管理者的角度,探讨了基于冲突探测的航班时刻优化方法。
In this paper, based on analyzing the requirement of DS for TE, the integrating framework is constructed, a schedule method suitable to TE is put forward, as well as the principle and the method of partitioning and mapping. 在分析区分服务对流量规划需求的基础上,设计了区分服务与流量规划结合的功能框架,提出了适合流量规划要求的队列调度方法和流量分割与映射的原理与方法。
In this paper, considering the case of large numbers of offensive objects and the constraint of the interceptive ability of the ATBM, the authors provide a general optimized decision model, using 0-1 integral schedule method, to determine the best intercepting plan. 在本文中,考虑了多个进攻目标的情况以及反导防空导弹拦截能力的限制,利用0&1整数规划的方法给出了确定反导防空导弹最佳拦截方案的统一的优化决策模型。
Module-Based Mobile Agent and Its Schedule Method 基于模块化的移动Agent及其调度方法
Research on Software Project Schedule Estimate Method based on Process 基于过程的软件项目进度估算方法的研究
In complex multi-task trading system, the organization and manipulation of data determines the schedule method, performance and execution efficiency of trading system. 多种交易方式共存的复杂交易系统,数据的组织形式和访问方法决定了系统处理各类交易业务的任务调度方式、系统的性能指标和执行效率。
The result shows that the said RPM schedule setting-up method is practical and reliable. 实践证明,该种设定方法实用可靠。
This paper proposed drafting schedule design method with equalizing rolling load method, analyzed detailedly design principle and concrete calculation procedure of this method. The primary mathematical models involved are also studied. 提出了压下规程的等负荷分配设计方法,详细分析了该方法的计算原理和具体计算过程,对计算中涉及到的主要数学模型进行了研究;
On the one hand, robust control method can ensure the stability with the existing of uncertainties; on the other hand, gain schedule control method can reduce the conservation resulting from the robust control method. 一方面,运用鲁棒控制保证系统在存在不确定性时的稳定性;另一方面,运用增益调度控制减小鲁棒控制带来的保守性。
This thesis researched the attitude control system of RBV in reentry phase, using a method, which integrates the μ-synthesis in robust control theory with the gain schedule control method, to design the controller. 本文对RBV再入段姿态控制系统的设计理论和方法进行研究,采用鲁棒控制中的μ综合理论与增益调度控制结合的方式设计控制器。
It is necessary to improve current schedule planning method in order to make the schedule management more efficient in a practically running project. 人们普遍的认识到,为了对项目进度进行有效的管理,对进度计划的方法进行改进以更加符合工程的实际是极其重要的。
Forward time buffer and resource buffer to coincide with the project schedule control method. ( 4) Finally, according to the TPH company to undertake the project schedule control improved time planning and monitoring and recording, the improvement was evaluated. 提出时间缓冲与资源缓冲想配合的进行项目进度控制的思路。(4)最后,笔者根据TPH公司承接项目进度控制改进的时间规划及监控记录,对改进效果进行了综合评价。
It presents a reliable model of schedule method and application of protocols for multi-media information transmission in industrial control network. It will improve the application of industrial control network system based on images in the fields of remote control, online determination, and etc. 为多媒体信息在工业控制网络传输中提供了调度方法和协议运用的一个可靠模型,将有效促进基于图像的工业控制网络系统在远程控制、在线检测等领域的应用。
The improved adaptive weight approach evolutionary algorithm based rolling schedule optimization method can optimize more objectives, use less runtime and are more likely to be used online. 基于改进权重自适应进化算法的轧制规程优化,考虑的目标更多,所需运行时间更少,在线应用的可能性更大。
As developers are distributed in different regions, there are large communication barriers among them, which may lead to big project schedule risks in software cooperative development. A fit project schedule management method and systems based on it will be necessary for software cooperative development. 在软件协同开发中,由于开发者地域分散而存在的沟通障碍将导致项目存在较大的进度风险,因此良好的项目进度管理方法与系统成为必须。
Secondly, the author expounds the issues on the mode of matrix management of HC Company and proposes a dual schedule control method for the plan and schedule of the designing projects. 其次,本文阐述了HC公司矩阵式的项目管理模式,并提出在设计项目计划与进度控制中采取双重进度控制的控制方法。